Industrial facilities — warehouses, logistics hubs, petrochemical plants and port facilities — feature large roof areas and demanding operational requirements. Fast Flow's siphonic drainage systems are ideally suited to these applications, providing high-capacity drainage with minimal structural impact and reduced maintenance requirements compared to conventional systems.

Featured Project

Continental Tyre
Rayong Plant

Rayong, Thailand
300m
Horizontal Pipe Run
Gradient Required
BIM
3D Coordination

Continental's Rayong tyre manufacturing plant is one of the largest facilities of its kind in Southeast Asia. Fast Flow's siphonic rainwater drainage system was engineered to traverse the facility's vast linear footprint — conveying rainwater through 300-metre horizontal pipe runs above live production lines, with zero gradient and zero disruption to factory operations.

Continental Tyre Rayong Plant, Thailand
Continental Tyre Plant — Rayong, Thailand
Key Challenges
  • The project was carried out within an operational tyre manufacturing facility, requiring construction to proceed at a rapid pace while maintaining uninterrupted production. Limited working space and restricted construction windows demanded meticulous planning and execution.
  • Installation works had to maintain complete weather protection throughout the construction period, ensuring no water ingress or disruption to ongoing factory operations.
  • The factory's exceptionally long linear layout required rainwater collection pipes to run horizontally for distances of up to 300 metres above active production areas, presenting significant hydraulic and coordination challenges.
Solutions
  • Fast Flow worked closely with the client to develop detailed construction staging and installation schedules, enabling each section of the project to be completed safely without interrupting factory operations.
  • Comprehensive 3D BIM coordination was carried out to resolve clashes in advance, ensuring efficient installation and eliminating unforeseen site issues.
  • Extensive off-site prefabrication of pipe assemblies minimized on-site installation time, reduced working-at-height activities, and improved installation quality.
  • Fast Flow's precision-engineered siphonic drainage system enabled rainwater to be conveyed through 300-metre horizontal pipe runs without gradient, delivering high-capacity drainage while accommodating the building's demanding structural constraints.
Achievements
  • Successfully completed installation within an operational manufacturing facility with no disruption to production, demonstrating the effectiveness of the prefabrication and phased installation strategy.
  • Detailed planning, BIM coordination and precise material management maximized labour productivity, minimized material wastage, and ensured efficient project delivery.
  • Delivered a high-performance siphonic drainage system capable of conveying rainwater through 300-metre horizontal pipe runs without gradient, keeping the vast factory interior dry throughout the year and protecting critical manufacturing equipment.
  • Delivered a reliable drainage solution that safeguards continuous manufacturing operations, ensuring one of Continental's largest tyre production facilities remains dry, protected and fully operational even during the most intense tropical rainfall.
Continental Tyre Plant — Installation Continental Tyre Plant — Pipework Continental Tyre Plant — Factory Continental Tyre Plant — Detail Continental Tyre Plant — Assembly Continental Tyre Plant — Drainage Continental Tyre Plant — Outlet Continental Tyre Plant — System

Page under
construction

This section is currently being prepared. In the meantime, please contact our team for information on our industrial project experience.

Industrial drainage
engineered for performance
Get in Touch →